From 1990 to the present, T. M. Gates, Inc. has removed more than 620 USTs, with a combined capacity of over 4.75 million gallons, in 14 states across the United States. The size of UST removal projects ranged from facilities with 1 UST to facilities with more than 100 USTs, and tank size varied from 500 to 30,000 gallons. At T. M. Gates, Inc. all UST removal is performed by certified UST professionals and supporting personnel. If soil and/or groundwater contamination exist in the soil surrounding the former UST, T. M. Gates, Inc. has the expertise and personnel to install corrective action measures during the UST(s) removal, which can be financially advantageous to the client. Below are typical pictures illustrating UST removals that T. M. Gates, Inc. has performed.
<About Us>  <Environmental Servies>  <Sanitary Services>  <Publications>  <Contact Us>
Removal of a multi-compartment 30,000 gallon UST located at a bulk chemical distribution facility.
Removal of a 12,000 gallon UST located at an airport fueling depot
Removal of a residential 550 gallon heating oil tank
Removal of a 2,000 gallon tank located inside a manufacturing warehouse
Staging of multiple USTs for purging, cutting, cleaning and eventual disposal
Loading of UST for disposal at scrap metal/recycling facility